Standard Requirements
- Drawings shall be legible and drawn to scale: 1/8” = 1’-0” minimum when uploaded.
- Drawings must show conformance to the applicable local and state codes.
- Do not use the color Red.
- Project address to appear on all documents.
- File extensions shall be PDF only.
- Document files shall be named with a general description of what the PDF contains. Example names: Site Plan; Drawing Set OR Construction Set; Truss Documents; Structural Calculations, Envelope Energy Compliance Forms; etc.
- Site Plan shall be uploaded as a separate, individual PDF.
- Truss Engineering and Truss Layout shall be uploaded as a single PDF file.
- Structural Calculations shall be uploaded as single PDF file.
- Building drawings (architectural sheets, structural sheets, and civil sheets) shall be combined and uploaded as a single PDF file. If scanned, must be full size and to scale.
- Drawings shall be prepared and signed/stamped by Oregon Licensed Design Professional where required per OSSC 107.1, ORS 671 & ORS 672.
Drawings shall include:
A. SITE PLAN:
B. ARCHITECTURAL DRAWINGS:
Shall include the following information at a minimum:
- CODE SUMMARY / CODE PLANS:
- Code Summary:
- Identify Construction Type, Occupancy Classification(s); Code Path if Mixed Use; Total Building Area; Total Occupants; Plumbing Fixture Requirements; etc.
- Other details and data necessary to show code compliance, such as requirements based on special uses and occupancy; fire alarm and/or fire sprinkler requirements, etc.
- Code Plans:
- Identify all required exits
- Show common path of travel, maximum travel distance and all fire life safety requirements on code plans.
- Show occupancy class and occupants per room/space for Tenant Improvement.
- Locations and classification of any required fire & smoke rated assemblies: fire wall, fire barrier, fire partition, smoke barrier, smoke partition
- Other details and data necessary to show code compliance
- Code Summary:
- PROPOSED FLOOR PLAN(S):
- A completely dimensioned floor plan for each level.
- All room uses identified.
- Door and Window locations
- Location of all plumbing fixtures (i.e. toilet, sinks, tubs, showers, hot tubs, dishwashers, water heaters, hose bibs, etc)
- Location of heating and/or cooling equipment.
- Locations of decks, patios, balconies.
- Location of any fireplaces (gas or wood) or wood stoves.
- Provide details and assembly numbers for any required fire-resistive assemblies.
- Clearly identify new and existing work.
- Other details and data necessary to show code compliance
- DOOR & WINDOW SCHEDULES – new windows & doors
- sizes
- material
- operation type (single-hung, casement, horizontal slider, etc)
- U-values, SHGC Values
- Door Hardware
- Provide Door Hardware Cutsheets or Specification as separate document if not enough information included on drawings to determine code compliance
- Fire-ratings if required.
- Other details and data necessary to show code compliance
- ROOF PLAN – if any alterations are being done:
- Clearly identify new and existing work.
- A completely dimensioned roof plan.
- Location of any skylights, dormers, and chimneys.
- Identify type of roofing material.
- Location of any required attic/rafter ventilation.
- Solar Ready Compliance
- Identify location and size of the solar-ready zone
- Identify future fire-fighter access and escape pathways
- Identify future interconnection pathway and termination location(s)
- Other details and data necessary to show code compliance
- EXTERIOR ELEVATIONS
- Provide elevation for each side of building.
- Accurately represent the building site and grading.
- Identification of siding materials and roofing materials.
- Dimensions from finished grade to key features, including to wall top plate and peak of highest roof for overall building height.
- Identify the roof pitch.
- Show location of all doors, windows, chimneys, decks, balconies, patios, exterior stairs.
- Other details and data necessary to show code compliance
- Show location of all doors, windows, chimneys, decks, balconies, patios, exterior stairs.
- Other details and data necessary to show code compliance
- BUILDING CROSS SECTIONS:
- Provide at least one longitudinal cross section & at least one transverse cross section. Recommend selecting additional locations to show unique circumstances.
- Insulation locations, type and R-values.
- Locations and tags for any required fire & smoke-rated assemblies.
- Detail Tags
- Other details and data necessary to show code compliance
- REFLECTED CEILING PLANS:
- Clearly identify new and existing work.
- Identify ceiling materials
- Identify ceiling heights
- Identify general lighting types/locations, general HVAC diffuser locations, attic access if applicable
- Identify any skylight locations
- Identify any required EXIT lights
- Identify any required emergency egress lighting
- Other details and data necessary to show code compliance
- ENLARGED PLANS – any necessary to show compliance with the building code.
- Restrooms: show all applicable required clearances
- Kitchens, Kitchenettes, Breakrooms: show all applicable required clearances
- Stairs, Ramps: show landings, handrail & guardrail locations/extensions, rise/run or slope, etc.
- Other details and data necessary to show code compliance
- INTERIOR ELEVATIONS – all necessary to show code compliance
- Restrooms: show all applicable required clearances
- Kitchens, Kitchenettes, Breakrooms: show all applicable required clearances
- Built-in Casework
- Built-in Reception Desks, Sales & Service Counters
- Stairs, Ramps: show landings, handrail & guardrail locations/extensions, rise/run or slope, etc.
- Other details and data necessary to show code compliance
- CONSTRUCTION DETAILS:
- Exterior Envelope Details
- Flashing, intersections with dissimilar materials, corners, end details, control joints, intersections at roof, eaves or parapets, means of drainage, water-resistive barrier and details around openings.
- Exterior Balconies and Elevated Walking Surfaces with Impervious Moisture Barrier Details – if applicable:
- Details for all elements of the impervious moisture barrier
- Product data & manufacturer’s installations instructions shall be uploaded.
- Details at intersections of any new fire & smoke-rated assemblies with adjacent framing.
- Details and fire-stop assemblies for any new/required penetrations in fire & smoke-rated assemblies.
- Ceiling construction details – if applicable
- Guardrail details – if applicable
- Exterior Envelope Details
C. STRUCTURAL DRAWINGS
Shall include the following at a minimum:
- GENERAL INFORMATION – if applicable:
- Floor dead & live loads
- Roof dead & live loads, including required solar-ready collateral loads
- Ground snow load
- Basic Design Wind Speed
- Seismic Design Category & Site Class
- Soils load bearing capacity: if over 1,500 psf, must submit a Geotechnical Report.
- Risk Category
- Roof Snow load data per OSSC 1603.1.3.
- Wind design data per OSSC 1603.1.4.
- Earthquake design data per OSSC 1603.1.5
- Flood design data per 1603.1.7 if applicable.
- Special Loads per 1603.1.8.
- FOUNDATION PLAN:
- Show location and size of footings, stemwalls, isolated pad footings.
- Identify hold down locations and types.
- Identify anchor bolt size/spacing.
- Other details and data necessary to show code compliance
- FLOOR FRAMING PLAN(S) – if applicable:
- One framing plan for each level.
- Indicate member size, spacing and bearing locations
- Indicate attachments, nailing, hangars and other connection details.
- Lateral Bracing locations, type, length
- Other details and data necessary to show code compliance
- ROOF FRAMING PLAN(S):
- Indicate member size, spacing, wood species/metal gage and bearing locations
- Indicate attachments, nailing, hangars and other connection details.
- Show the size and location of any required attic access.
- Other details and data necessary to show code compliance.
- CONSTRUCTION DETAILS:
- Foundation details showing size/placement of reinforcement steel; location of any required insulation, attachments of wall & floor framing, etc.
- Framing connection details.
- Lateral bracing details
- Other details and data necessary to show code compliance.
SUPPORTING DOCUMENTS:
TRUSS DOCUMENTS – if applicable:
- Truss layout
- Truss Engineering, signed/stamped by Oregon licensed engineer.
STRUCTURAL CALCS:
- Signed/stamped by Oregon licensed engineer
- Include solar ready roof dead load and live load.
- Any details shall be included on a Drawing Sheet.
ENVELOPE ENERGY COMPLIANCE FORMS
Must be signed where noted on forms.
- Oregon Energy Efficiency Compliance Form
- COMCheck Supplement Form
- Envelope COMCheck Report
- ZERO Energy Calculator Report
SPECIAL INSPECTIONS AGREEMENT FORM - if applicable
- Completed and signed by all required parties.
Revisions:
For changes that occur after a permit has been issued, the following is required:
- All revised areas must be clouded on the Drawings. Cloud only the specific area(s) of change.
- All impacted drawing sheets need to be updated/revised.
- All revised supporting documents need to be included.
- Only upload the revised drawings sheets and supporting documents.